Completed kitchen — turnkey renovation
— Services / Turnkey Renovation

Turnkey
Renovation

Design to handoverAll labour and materialsOne contract, one teamFixed price4-year warranty
— What this is

One company,
start to finish

A turnkey renovation means you hand over a set of keys and take them back at the end. Everything between those two moments is ours — the design, the drawings, the engineering, the demolition, the trades, the materials, the fitted furniture, the snagging and the warranty. There is no main contractor to appoint, no separate designer to coordinate, and no gap between the drawing and the wall for a decision to fall through.

All labour and materials, at one fixed price. Everything named in the specification is in the quotation you sign — no provisional sums, no shopping lists to chase, and no surcharge raised halfway through because something was left out of the original number.

Curved stair and upper landing
Villa VH — stair and upper landing

What a turnkey project involves

— Scope
Whole property, with materials

Apartments, villas and houses taken in their entirety — including everything specified, sourced and supplied through us.

— Timeline
From 3 months design, then delivery

The programme is fixed in writing before works begin and reported against weekly. A date we can hold beats a date that sounds better.

— Contract
One, with a fixed price

Scope, specification and programme agreed before a wall is touched. Any change is priced and signed before it happens.

— What we take on
  • Complete, high-specification renovations
  • Complex engineering and integrated systems
  • Bespoke integrated furniture and stonework
  • Properties across the UK, UAE and Georgia
— Payment

Staged against completed milestones, inspected before release. Never in advance of the work.

Integrated lighting, delivered in the ceiling line
— What you actually get
1
Fixed price
Agreed before works begin and honoured to the end.
100%
Labour and materials
Everything included — nothing left as a provisional sum.
1
Accountable team
Nothing is passed to another company mid-project.
4
Year warranty
Issued as a certificate at handover, on all works.
— Scope

What is included

/ 01Design and technical documentationStage one+

The renovation starts on paper. Measured survey, planning solutions until the layout is settled, photorealistic visualisation of every room, then the complete technical set the trades build from — drawn by us, for a site we run ourselves.

  • Measured survey and existing-conditions plan
  • Planning solutions, unlimited options
  • Photorealistic 3D of every room
  • 38-drawing technical set
  • Engineering layouts, coordinated
  • Drawings for every bespoke fitted piece
  • Full material and fitting specification
  • Quantities, allowances and schedules

The design stage in detail →

/ 02Strip-out and first fixRough works+

Demolition, removal and the structural groundwork the rest of the project stands on. This is the stage nobody photographs and everybody feels later — a floor that isn't level or a screed that isn't dry will show through every finish laid on top of it.

  • Demolition and controlled strip-out
  • Waste removal and site protection
  • New partitions and openings
  • Structural alterations where approved
  • Screeds and floor levelling
  • Soundproofing and acoustic treatment
  • Waterproofing to wet areas
  • Substrate preparation to all surfaces
/ 03Engineering and servicesMEP+

Everything behind the surface, designed before it is installed and coordinated against the interior so that services disappear into the finish rather than being worked around after the fact.

  • Plumbing and drainage
  • Electrical power and distribution
  • Lighting circuits and control
  • Heating, including underfloor
  • Ventilation and air conditioning
  • Low-voltage and structured wiring
  • Security, fire alarm and CCTV
  • Multiroom audio, AV and home cinema
  • Smart home automation
  • Commissioning and testing of every system
/ 04FinishesAny complexity+

The layer that gets judged. Stone set out from a drawing rather than improvised at the wall, ceilings with shadow gaps that hold a line, and decorative work by trades who do only that.

  • Plastering and skim to a flat finish
  • Natural stone and marble, set out to drawing
  • Tiling and large-format porcelain
  • Decorative and specialist wall finishes
  • Wall panels and TV panels
  • Painting and lacquer work
  • Ceilings, coffers and shadow gaps
  • Stretch ceilings where specified
  • Timber, parquet and herringbone floors
  • Skirtings, architraves and thresholds
/ 05Integrated and custom furnitureMade to drawing+

Drawn against the surveyed space, manufactured by our vetted workshops, installed by our own fit-out teams and adjusted after installation — because a door that closes perfectly in a workshop does not always close perfectly in a building.

  • Custom and integrated kitchens
  • Worktops in stone, including bookmatched
  • Integrated and built-in wardrobes
  • Dressing rooms and internal fittings
  • Bathroom vanities
  • TV walls and living-room units
  • Wine rooms and display units
  • Bespoke and authored feature pieces

Integrated wardrobes in detail →  /  Kitchens and bathrooms in detail →

/ 06Materials and procurementIncluded+

Everything specified in the design is sourced and supplied through us at trade terms — from the fixings to the authored furniture piece. We specify materials we have used for years and know how they age, and nothing is substituted between the drawing and the delivery.

  • Finishes, stone and tile
  • Sanitaryware and brassware
  • Doors and ironmongery
  • Lighting and control equipment
  • Appliances and equipment
  • Loose and fitted furniture
  • Trade terms passed through
  • Guarantee on supplied goods
/ 07Quality controlThroughout+

British-standard supervision applied continuously rather than at the end. Every stage is inspected against the issued drawings before the next stage covers it up — which is the only moment most defects can still be corrected cheaply.

  • A named project manager throughout
  • Weekly site inspections
  • Setting-out checked against drawings
  • Hold points before each stage is covered
  • Materials and samples approved on site
  • Services tested before closing up
  • Written client reporting
  • Deviations authorised in writing only
/ 08Handover and warranty4 years+

Snagged against the approved drawings, cleaned, styled and walked through with you room by room. The warranty certificate is issued at handover, and if something needs attention afterwards one call is enough.

  • Snagging against the approved set
  • Full commissioning of all systems
  • Deep clean and final styling
  • Room-by-room walkthrough
  • Operation and maintenance information
  • Warranty certificate issued
  • Rapid response to any claim
Finished bathroom, ready for handover
Bookmatched marble
— Why one company

When three companies share a project, they share the credit and divide the blame.

A designer, a contractor and a fit-out firm each doing their part correctly can still produce a room that doesn't work — because the failures happen between them, not inside them. Taking the whole scope is the only way to remove that gap entirely.

10Stages, each signed off
— The programme

What happens, and in what order

A renovation goes wrong in the sequencing far more often than in the workmanship. This is the order every project follows, and the checks that sit between the stages.

Before site

  1. Consultation and brief
  2. Measured survey
  3. Planning and design
  4. Visualisation and approval
  5. Technical documentation
  6. Fixed quotation and contract

On site

  1. Strip-out and demolition
  2. Partitions and structure
  3. First fix engineering
  4. Screeds and waterproofing
  5. Plastering and substrates
  6. Stone, tile and flooring
  7. Second fix and furniture install
  8. Decoration and final finishes

Closing out

  1. Commissioning and testing
  2. Snagging against drawings
  3. Deep clean and styling
  4. Client walkthrough
  5. Warranty certificate
  6. Aftercare
— The same property, four stages

Shell to handover

Filmed on our own sites. This is what the stages above actually look like between the first day and the last — ending in a room somebody now lives in.

01 — Shell, stripped and plastered
02 — First fix and structure
03 — Stone set out from the drawing
04 — Finished, furnished and handed over
— Every room, not a selection

The whole property

Kitchens, bathrooms, bedrooms and storage are not separate services we sell — they are rooms inside a renovation we deliver as one.

Kitchen
Kitchens
Bathroom
Bathrooms
Bedroom
Bedrooms
Dressing room
Dressing and storage
— Scope honesty

What we don't do

— 01

Single rooms or single items

Not one kitchen, one bathroom or one wardrobe on its own. A room delivered inside someone else's renovation depends on work we didn't do and can't stand behind.

— 02

Design without delivery

We don't sell drawings for another company to build. A design stops being ours the moment it is interpreted, and we won't be judged on a result we didn't control.

— 03

Basic or cosmetic refurbishment

Repainting, patching and light cosmetic work isn't what our teams are set up for. We take complete, high-specification renovations.

— Selected work

Delivered end to end

Each of these was designed, engineered, built, fitted out and handed over by the same company.

Villa PV
Villa PV
VillaTurnkey
Villa VH
Villa VH
VillaTurnkey
Villa PJ
Villa PJ
VillaTurnkey
Villa T
Villa T
VillaTurnkey
— Questions

What clients ask

What is included in the price?+

All labour and all materials. Stone, tile, sanitaryware, brassware, doors, ironmongery, lighting, appliances and furniture are sourced and supplied by us at trade terms as part of the project.

You are not sent a shopping list and left to chase suppliers, and nothing arrives on site that wasn't specified.

Will you renovate just my kitchen or just a bathroom?+

No. We take properties in their entirety, not individual rooms or individual items.

A single room dropped into an existing renovation sits on floors, services and substrates that someone else installed. If those are wrong, the room fails and the warranty is meaningless.

Is the price really fixed?+

Yes. The quotation is itemised against the completed drawing set, which is why we produce the drawings before we price — a price given without documentation is an estimate pretending to be a quotation.

If you change your mind during the works, that change is priced and agreed in writing before it is carried out.

How long does a turnkey renovation take?+

The design stage runs from three months. The construction programme depends on the size of the property and the complexity of the engineering, and is fixed in writing before works begin.

Progress is reported to you weekly against that programme.

Who is on site, and who do I speak to?+

One named project manager runs the site and is your point of contact throughout. Above them, the founder stays involved from the brief to the handover.

You never have to relay a message from a designer to a contractor — they work for the same company.

What does the warranty cover?+

A four-year warranty on works is issued as a certificate at handover. Goods supplied through us also carry their manufacturer guarantees, which we register and hold on your behalf.

One call is enough — there is no argument about which trade is responsible, because they were all ours.

Do you work in all three countries?+

Yes — the United Kingdom, the United Arab Emirates and Georgia. The management standard, the documentation and the quality control are identical in each.

What differs is local regulation and supply chains, handled by the local team rather than passed to you.

Can I live in the property during the works?+

On a full turnkey renovation, no — and we will say so at the brief rather than three weeks into the strip-out.

The programme is faster and the finish is better with unrestricted access to the property.