Kitchens and bathrooms are where a renovation is judged, and where it most often fails. Both have to absorb plumbing, drainage, extraction, power and appliances of fixed dimension, then finish in stone that cannot be adjusted once it is cut. Both are wet, both are used every day, and both are unforgiving of shortcuts taken underneath. We draw them alongside the engineering layouts so the services arrive exactly where the cabinetry and the sanitaryware expect them — with all labour and materials included in one fixed price. Both are delivered as rooms within a full renovation, on the same contract and the same fixed price.
Labour and materials together in a single itemised quotation, agreed before works begin and honoured to the end.
Brands and models we have used for years and know how they age — written into the specification, not decided on site.
Waste, supply, extraction and power positions are drawn from the cabinetry, not discovered around it.
We return to adjust doors, drawers and alignment once the building has settled and the finishes are complete.
The kitchen has the least tolerance for error in the building. It has to absorb plumbing, extraction, power, appliances of fixed dimension and a worktop that cannot be adjusted once cut — so it is drawn alongside the engineering layouts rather than after them.
Stone is chosen as slabs rather than from a sample, because the veining decides where the joints can go. Once selected it is dry-laid, sequenced and templated on site so the pattern runs the way it was drawn.
A bathroom is a small, complex, permanently wet engineering problem. Everything that matters happens before it looks like a bathroom — falls, tanking, drainage positions and substrate. Get those right and the room lasts decades; get them wrong and no amount of stone will save it.
Vanity units have to survive a wet room for years, so the substrate and the edge detailing matter more than the face. Waste and supply positions are set out from the vanity drawing rather than the vanity being built around whatever the plumber left.
Everything is named in the specification by model and finish, then procured through us at trade terms and included in the price. We specify materials we have used for years and know how they age — and nothing is substituted between the drawing and the delivery.
Large-format work is unforgiving — a substrate a few millimetres out shows as lipping across every joint. Setting-out is drawn as elevations first, so cuts land where they were designed to rather than wherever the run happens to end.
Falls, tanking, drainage and substrate are all buried before the first tile goes on. We build them, we flood-test them, and we warrant them — which is only possible because the same company did the work underneath.
Kitchens and bathrooms fail at the joins — between the survey and the drawing, the drawing and the workshop, the workshop and the site. This is how each of those handovers is controlled.
Cabinetry going in, stone being set and polished by hand, and the same rooms finished. No stock footage and no other company's work.
The same drawings, the same trades and the same programme — which is why the stone in the kitchen and the stone in the bathroom actually match.
Each room below sits inside a renovation we delivered in full — substrate, services and waterproofing included.
All labour and all materials — cabinetry, stone, tiling, waterproofing, sanitaryware, brassware, appliances, lighting and fixings — in one itemised quotation.
There are no provisional sums and no shopping list for you to chase. If it is named in the specification, it is in the price.
Proven ones. Carcass board, hardware, tanking systems, adhesives, sanitaryware and appliances from manufacturers we have used for years and have watched age on real projects.
Every item is named by model in the specification and procured through us at trade terms, so nothing is quietly swapped for a cheaper equivalent.
Because it is the only thing standing between a wet room and the structure beneath it, and it is completely invisible once tiled.
We tank the full wet area and flood-test it before any tiling begins. A leak found at that stage costs an afternoon; the same leak found two years later costs the room.
You do, from slabs rather than samples. Veining varies enormously between slabs of the same material, and the piece you approve is the piece that gets installed.
We dry-lay and sequence it before fixing so you can see how the pattern will run across the worktop and the splashback.
Because a worktop cut to a drawing dimension assumes the carcasses landed exactly where the drawing said, and buildings rarely cooperate to that standard.
Templating after the units are in adds a short stage and removes the risk of a stone top that doesn't fit.
Doors and drawers are adjusted after installation, again before handover, and covered by the four-year warranty afterwards.
One call is enough — there is no argument about whether the fault lies with the fit-out, the tiling or the plumbing, because they were all ours.